The Platform

3D Content Creation & Management

Manage an unlimited number of 3D assets, scenes and media with ease

Book a demo
All features built in

Built for Product Customisation

Intuitively organised and built-for-purpose, the Plattar platform allows users to manage even the most complex product range of any size with ease.
  • Large portfolios and complex, configurable ranges
  • Manage teams across projects
  • Analyse usage and performance data
  • Stay on top of 3D and AR scenes, media files
The Plattar Scene Creator interface displaying a 3D sofa model, surrounded by a circular diagram of four platform capabilities: manage content end-to-end, syndicate content and scenes, team management and collaboration, and performance analytics.

Learn why the team at BROSA loves our CMS to easily add, edit, and manage their 3D content in Plattar

Read the full story
Integrated solution for digital 3D asset management

Import. Edit. Store. Share. Manage.

Benefit from streamlined workflows that save time and increase productivity.
And most importantly, keep all your 3D and AR assets up-to-date in one place.

All features built in

The smartest 3D & AR platform out there.

An interface that is simple and easy to use. We makes file management and organisation intuitive and productive.
  • Omlet is a game-changing 3D content creation platform that transforms how businesses approach 3D/AR product visualization. Key benefits include:
  • Versatile Content Creation: Create 3D content manually, using photogrammetry, or with generative AI.
  • Easy Workflow Switching: Seamlessly switch between different production methods for optimal efficiency.
  • Integrated Experience: Works directly with Plattar’s core platform for a smooth user experience.
  • Project Management: Built-in tools to manage large-scale projects effortlessly.
  • Automated Quoting: Save time and resources with automated quoting features.
  • Cutting-Edge Technology: Uses advanced AI and photogrammetry for fast, cost-effective, and automated production.
  • Flexible Models: Choose from white-labeled, central platform, or open marketplace options to suit your needs.
Screenshot of the Plattar 3D asset management platform showing a project dashboard where furniture models and scenes can be imported, tagged, organised, and published — with callouts highlighting in-built tools for imports, conversion and optimisation; intuitive search and tagging; rapid prototyping via content marketplace integrations; and a content pipeline with review and status controls.
Sharing and collaboration

Bring the entire team together

Enjoy access and permission controls across your portfolio, sharing files, prototyping and collaborating with colleagues and clients.

  • Complete user and permission management
  • Enterprise-ready single-sign-on (SSO)
  • Easily upload, share and syndicate content
  • Create teams and collaborate remotely
Image
Adaptable to your needs

Integrate seamlessly with your existing ecosystem

Plattar has been built to complement your existing systems and workflows, and is easily custom-scripted to suit your needs.
  • Bring in data from CRM, PIM or DAM
  • Integrates with all major eCommerce platforms
  • Own and control media libraries
  • Export content and data out
Diagram showing a two-way web integration platform: on the left, icons for a database, content management, and file storage connect via arrows to a browser window displaying an eCommerce product page with AR and 360° viewing. On the right, integration icons for eCommerce, showrooms, apps, and in-store channels are listed beneath the heading "Integrate with ease".
Capture, analyse, export

Real, measurable results
at your fingertips

Capture and analyse end user data in order to gain insights about the nature, interaction and impact of your outputs, in real time.

  • Inbuilt analytics and reporting
  • Plattar Report Builder to generate custom insights
  • Export data into Google Analytics
  • Use Plattar API/SDK to easily link and export data
Image
Reach every touchpoint

Publish ready? Just click send.

Distribute your 3D product visualisations and Augmented Reality product experiences to multiple touchpoints with a few clicks. No coding skills required.
A 3D sofa model is imported into a Scene Creator tool on a tablet, then published as an interactive product page — shown on a laptop with AR and 360° viewing options, on an Android phone with colour swatches, and on a smartphone displaying the sofa in an augmented reality home setting.
Want help managing your 3D & AR product experiences?

Plattar end-to-end services

You don’t have 3D content yet or prefer not to manage content and end-user experiences in-house? We offer fully managed solutions and our team of experts can support you from 3D content production and technical support to launch and ongoing management

Ready to bring your products to life?

See how Plattar can lift engagement and conversion for your brand. Book a personalised walkthrough with our team.
Book a demo
Talk to sales